DESCRIPTION

Crescent Power Systems has teamed up once again with a valued midstream partner to expand one of their natural gas liquids pipelines. This project is expected to expand NGL throughput capacity on this TX-LA pipeline to 185K bbl/day. Based on marketing commitments, this expansion had to be executed within three months.

CPS was chosen to provide a solution consisting of NEMA 3R MV VFD Synchronous transfer systems capable of driving six pumps at each site, which met the schedule constraints of the customer. Using our expertise as a power systems integrator, we were able to navigate the many hurdles introduced with direct releasing highly sophisticated electrical systems and provide the guidance required for the installation contractors in the field. Crescent Power’s direct factory relationships provided the insight and leverage necessary to overcome numerous supply-chain and logistical challenges that threatened the success of this project.

PROJECT DETAILS

Categories:
Location: Beaumont, TX & Lake Charles, LA
Completed: TBD